BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20230719T210000Z
DTEND:20230720T000000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:CAMPO Chestnut Street Multimodal Corridor Study - Open House
DESCRIPTION:The Capital Area Metropolitan Planning Commission (CAMPO) and the City of Bastrop are partnering to develop a plan for multimodal improvements for the Chestnut Street corridor. This Study includes the entirety of SL 150/Chestnut Street from SH 71/Sh21 at Childres Drive to SH 71/SH95 at Tahitian Drive.
X-ALT-DESC;FMTTYPE=text/html:The Capital Area Metropolitan Planning Commission (CAMPO) and the City of Bastrop are partnering to develop a plan for multimodal improvements for the Chestnut Street corridor. This Study includes the entirety of SL 150/Chestnut Street from SH 71/Sh21 at Childres Drive to SH 71/SH95 at Tahitian Drive.&nbsp\;
LOCATION:Lost Pines Art Center 1204 Chestnut Street Bastrop\, TX 78602
UID:e.2216.36480
SEQUENCE:3
DTSTAMP:20260429T204704Z
URL:https://bastrop-gzcms.preview.gochambermaster.com/events/details/campo-chestnut-street-multimodal-corridor-study-open-house-36480
END:VEVENT

END:VCALENDAR
